1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Interior demolition as per plans filed. no change to use egress nor occupancy.
Support of excavation scope as related to townhouse renovation as per plans filed herewith.
General construction to include interior renovation and minor demo as per plans
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Mechanical modifications to an existing apartment as per plans.
Limited Mechanical Upgrades at Apartment 4C including mechanical louver installation to replace existing window. No change to use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Installation of 370' new sidewalkshed as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Structural demolition as per plans filed herewith.
Remove and replace coping stones, install waterproofing where necessary.
Mechanical work associated with townhouse renovation as per plans filed herewith.
Herewith filing underpinning work, as per plans submitted. Filed in conjunction with ALT 1#: 121330327 and SOE#: M00852650.
Herewith filing support of excavation to provide foundation bench, as per plans submitted.
Installation of temporary alternate platform and temporary system scaffold stair as per plans filed herewith. filed in conjunction with construction application m00520677 and struc…
installation of new commercial kitchen plumbing fixtures and related rough-in-piping. The installation of new grease interceptor. The installation ofnew public bathroom fixtures an…
Structural slab repairs and associated framing on 3nd floor as per plans filed herewith. No changes in use, egress or occupancy.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress o…
Non-structural interior buildout (prada) work to include partitions, milwork, finishes, ceiling work as per plans. no change in use egress or occupancy.
Installation of new mechanical systems in association with townhouse renovation, install new vrf heat pumps and associated piping and ductwork. install new ervventilation system. n…