1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Installation of new sidewalk shed and pipe scaffold with material hoist at 115 east 81st street, manhattan as per plans. there will be no change in the use, egress, or occupancy un…
plumbing work associated with the duplex apartment renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
New slab opening in B4 level for ductwork.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Interior Renovation of an existing apartment that includes bedroom, kitchen and bathroom. Existing fixtures and appliances to be replaced. New washer/dryer to be installed. No chan…
2 Boiler installation in conjunction with Alteration
Installation of temporary barrier as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Renovation of apt. 5d on 5th floor. minor partition changes, new finishes and millwork throughout. no changes to use, occupancy, or means of egress
Northwell Lenox Hill Biplane Project: modify HVAC system to conform with new layouts as per plans filed herewith.
Foundation and earthwork work related to existing building alteration m01153426-i1.
Replace existing air handling unit and associated ductwork and piping in B4 and B3 levels.
Mechanical work for tenant fit-out of Jersey Mikes restaurant at this location. Mechanical Systems include commercial kitchen rangehood ventilation system for tenant fit-out as sho…
Demo of cellar slab & reconstruction of new slab, demo of non-bearing partitions, new stairs to new penthouse addition & partial reconstruction of exist stairs, install new applian…
Structural and foundation work in conjunction with alteration of existing 1-family dwelling
Construction fence filed as per plan provided.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Herewith filing mechanical modifications in conjunction with tunnel connector per plans. no change in use, occupancy or egress under this application. please assign to sahar baker-…