1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation of 10th floor apt., work includes removal of non load bearing partitions, new partition layout, new finishes, millwork, flooring; lighting and painting througho…
Blank street coffee-- general construction inclusive of partitions modifications for cafe build-out. no change to use, egress, or occupancy.
Design Structural Set, showing the proposed support layout, detail, and other relevant structural information and considerations with the main OT# M01335229-I1
Application filed for interior renovation of non-load bearing partitions, ceilings and finishes on the partial 22nd floor as per plans filed herewith. no change in use, egress, or…
Interior demolition and renovation of an existing 8th floor apartment apt#8d. no change in use, egress, or occupancy.
Sidewalk Shed installation as per plans filed herewith.
Replacement of Plumbing fixtures in Apt. 12C to facilitate the renovation work filed separately under M01219640-I1. No changes in the use, egress and occupancy.
Foundation and Structural modifications as per plans. No change to use, egress or occupancy.
Renovation of existing COOP, on 12th floor, (12W) renovate kitchen, (1) bathroom, replace most windows, minor additional construction. MS and Pl filed under separate applications.…
Plumbing modifications in apartments 5B and 6B as per shown on plans filed herewith. No change in egress, occupancy, or use.
Hereby filing hvac system and related ductwork & piping per plans filed herewith. no change to use, egress or occupant
Renovate exisitng bathrooms and kitchen, remove and replace fixtures in all bathrooms and kitchen as per plans. No change in use, occupancy, or egress.
Proposed booster pump system and associated equipment enclosure to be located on the bulkhead roof of Apartment 21C. Development Design Architectural Set, indicating the proposed l…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Reconstruction of cellar slab, new 16 ft addition at basement & 10ft addition at 1st floor, new penthouse addition, new stairs to penthouse, partial reconstruction of existing stai…
Herewith file mechanical plans in conjunction with general construction, PW3 fees generated in this S2 document are paid separately from the I1 document.
Plumbing work filed in conjunction with the renovation of an existing dwelling unit. Architectural and mechanical work filed separately. No change of use, occupancy or egress.
General construction for interior renovatioins as shown herewith. no changes to egress, occupancy or use.