2,092 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,092 permits
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modifications to the existing Sprinkler and Plumbing systems on the 5th and 7th floor as per plans submitted herewith. No Change to the Use, Occupancy or Egress.
Installation of temporary construction barriers as per plan. no change in use, egress or occupancy. the barricade is at east 82nd street and 3rd avenue elevations.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed columns front of the building.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary system stairs tower as per plan. no change in use, egress, or occupancy. the system stairs tower from the first floor to the eighth floor at east 82nd str…
Interior renovation with vertical and horizontal enlargement to show additional occupied floors on CO associated with vertical enlargement as per plans filed herewith.
Herewith filing for tunnel connection in conjunction w/ 15 east 88th st per plans. no change in use, occupancy or egress under this application.
Installation of temporary storage as per plan. no change in use, egress, or occupancy. the storage is top of the sidewalk shed e at east 70th street elevation.
Plumbing alterations to unit 4b including alterationsto bathrooms. no change to occupancyand egress. no change to structure. no gas work
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed east 70th street front of the building.
Installation of jersey barrier & plywood fence as per plans. the jersey barricade & fence to be installed on the roadway and shall be permitted at dot. no change in use, occupancy…
Renovation of an existing single family dwelling. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupanc…
Installation of temporary needle beam / overhead protection as per plan. no change in use, egress, or occupancy. the needle beam overhead protection at 8th floor in the building
Plumbing work in connection with the interior renovation in the existing residential unit #11B. No change in use, occupancy or egress.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the sf from the top of the sh and the penthouse terrace past the main roof wall, around…
Renovation of an existing apartment on the third floor. work includes non-structural demolition, general construction
Installation of temporary need beam/overhead protection.as per plan. there is no change in use, egress, or occupancy. the need beam system/overhead protection at the north elevatio…
Installation of temporary construction fence as per plan. no change in use, egress or occupancy. the plywood fence at east 82nd street and 3rd avenue elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at truck e ntrance over the street lane pedestrian walkway.