2,092 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,092 permits
Plumbing alterations to unit 4b including alterationsto bathrooms. no change to occupancyand egress. no change to structure. no gas work
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Plumbing work of single-family residence. no change of egress, use or occupancy
Renovation of an existing apartment on the third floor. work includes non-structural demolition, general construction
Facade repairs. no change in use, egress or occupancy. sidewalk shed and scaffolding to be designed and filed by others.
Plumbing work in connection with the interior renovation in the existing residential unit #11B. No change in use, occupancy or egress.
Work at apartment 5A on 5th Floor - refurbish kitchen & bath, minor non-load bearing partitions removal, new flooring, new split system hvac unit with exterior unit at terrace and…
Partial demolition work to include removal of non-structural masonry wall for new thru-wall self-condenser unit installation below window sill. No structural member will be affecte…
Mechanical work associated with the renovation of an existing 6th floor apartment. No change to use egress or occupancy.
Mechanical work at the 7th floor as per plans filed herewith
Installation of the sidewalk shed front of the building at 17 east 77th street
Installation of temporary pipe scaffold at the south (front) from the top of the sh bridge past the main roof parapet, north ( rear) elevation from the ground and setback to past m…
Herewith filing architectural renovations for tunnel connector to 12 east 89th st per plans. no change in use, occupancy or egress under this application.
Installation of the sidewalk shed front of the building at 15 east 77th street
Installation of new VRF Air-conditioning, ventilation, boiler, and heating systems
Structural joist repair and new roof dunnage for hvac units associated with interior renovation of existing multi-family townhouse, as per the engineer's plans. there is no change…
Temporary construction fence in conjunction with Alteration.
Renovation of an existing five-story multi-family residential townhouse, including replacement and installation of non-load bearing partitions, kitchens, bathroom fixtures, millwor…
Installation of new roof-mounted hvac equipment, condensing units, air handlers, ductwork, fresh air intake and exhaust systems, diffusers, grilles, refrigerant piping, and condens…
Herewith filing structural modifications for tunnel connector to 12 east 89th street per plans. no change in use, occupancy or egress under this application.