1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Facade repairs as indicated on the plans filed herewith. no change in use, egress, or occupancy
Installation of temporary stair tower as per plan. no change in use, egress, or occupancy.
Plumbing with the renovation of existing apartment 2d on the 2nd floor. as per plans filed herewith. no change of use, egress, or occupancy.
Mechanical work filed in conjunction with renovation and combination of existing 15th floor apartment (aka 'penthouse') & 14th floor apartment (1505). install split a/c system, rad…
Facade repairs of the garage no change to use or egress under this application.
Replacement and relocation of existing plumbing fixtures and associated piping. No chang in use egress or occupancy.
Installation of temporary material hoist as per plan. no change in use, egress, or occupancy.
Structural work filed in conjunction with combination of apts 1505 (14th fl) with apt ph (15th fl). structurally frame proposed convenience stair opening between 14th & 15th floors…
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nybc
Renovation of existing apartment #11DS as per plans. Remove & install non-bearing interior partitions, remove existing soffit, ceilings, patch existing beams. No change in use, egr…
Removal, replacement, relocation and installation of new plumbing fixtures.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio…
Application filed for plumbing additions/modifications on the 17th fl (suite phe) as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation to apartment 14B located on the 14th Floor , Remove and construct none load bearing parttiotions provide and install finishes all as per plan , no change in use…
Plumbing work filed in conjunction with mix use commercial & residential building. replace existing plumbingfixtures on existing roughing. relocate shower.
Plumbing work related to the interior renovation of apartment 6b & 7b on the 6th & 7th floors. all plumbing work on the 6th floor only. no change in use, egress or occupancy.
Pl work filed in conjunction with dob now gc. no change to use, occupancy or egress.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the nyc buil…
Minor interior work to include new interior finishes. no exterior work, no change in egress or use.
Plumbing work in conjunction with interior renovation to apt. 9g on the 9th floor. as per plans. no change in use, egress, or occupancy under this application.