2,092 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,092 permits
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Partial demolition work to include removal of non-structural masonry wall for new thru-wall self-condenser unit installation below window sill. No structural member will be affecte…
Mechanical work at the 7th floor as per plans filed herewith
Installation of temporary pipe scaffold at the south (front) from the top of the sh bridge past the main roof parapet, north ( rear) elevation from the ground and setback to past m…
Installation of temporary construction fence as per plan.
Repair existing cooling tower dunnage at roof of south building including steel beam reinforcement, patching of concrete dunnage frame and temporary shoring of dunnage and mechanic…
Mechanical work including installation of a new self-contained cooling unit and mechanical exhaust vent through a new head transom panel in 1 existing window frame. No change in us…
Mechanical work associated with the renovation of an existing 6th floor apartment. No change to use egress or occupancy.
Installation of new roof-mounted hvac equipment, condensing units, air handlers, ductwork, fresh air intake and exhaust systems, diffusers, grilles, refrigerant piping, and condens…
Installation of the sidewalk shed front of the building at 15 east 77th street
Interior renovation of 7th floor apartment as per plas filed herewith
Herewith filing structural modificaitons in conjunction with new school occupancy.
Interior renovations of existing apartment #5B. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Structural joist repair and new roof dunnage for hvac units associated with interior renovation of existing multi-family townhouse, as per the engineer's plans. there is no change…
Temporary construction fence in conjunction with Alteration.
Renovation of an existing five-story multi-family residential townhouse, including replacement and installation of non-load bearing partitions, kitchens, bathroom fixtures, millwor…
Herewith filing structural modifications for tunnel connector to 12 east 89th street per plans. no change in use, occupancy or egress under this application.
Herewith filing architectural renovations for tunnel connector to 12 east 89th st per plans. no change in use, occupancy or egress under this application.