1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Filing for interior demolition and general construction of a single family home. No change in use, egress of occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Herewith filing for mechanical modifications in conjunction w/ new school occupancy.
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Plumbing work at apt. #14AB at the 14th Floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application
Renovation of an existing apartment of the 13th Floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or o…
Update to existing sprinkler system at 7th floor as per plans filed herewith
Plumbing work at 7th floor at per plans filed herewith
Interior renovation- removal of non-bearing partitions throughout the blding. existing service elevator and egress stairs to remain. extg partial sprinkler on cel, 1 & egress stair…
Interior renovation of apartment phw on the 15th floor. no change to use, egress, or occupancy..
Interior renovation of existing triplex unit #phb including new floor and wall finishes as per the drawings filed herein. plumbing application #m01332610-s1 mechanical application…
Installation of two temporary pilasters/header to frame an existing gallery entry.no alt to exist structures for an Art Exhibit. A TPA permit is not required. Producer is responsib…
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this…
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 1st floor (apt 1a) as per plans filed herewith. no change in use, egress, or…
Installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chatper 33 of nycbc
plumbing work associated wth interior and exterior renovation of the apartment as shown on plans filed herewith. No change to use, egress or occupancy.
Masonry facade work as per plans. No change to use, egress, or occupanyc.
Application filed for mechanical upgrades as shown on plans.
Rremodel apt 2c on the second floor. no change in use, egress or occupancy.
Plumbing work to apartment 11a consisting of removal and installation of bathroom, powder room and kitchen fixtures as per plans filed herewith. no change in use egress or occupanc…