1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Removal of one stair, one elevator, removal of concrete slab to create double-height space, installation of two stairs and one elevator as per plans filed herewith. no change in us…
General construction architectural for the renovation of existing apartment 2d on the 2nd floor. as per plans filed herewith. no change of use, egress, or occupancy.
Hereby filing for the interior renovation of apartment 5n on the fith floor. no change to use, egress or occupancy.
Interior renovation of an existing 5-story 1-family dwelling
Minor Interior removals of non-load bearing partitions. No change to occupancy, use or egress under this application.
Renovation of an existing apartment # 8AS on the 8th floor. Work includes non-structural demolition, general construction and mechanical modification as per plan filed herewith. No…
Renovation and combination of apt 5b & 5c on the fifth floor as per tppn 3 of 1997. demolition and construciton of non-structural partitions. removal of one kitchen. plumbing work…
Interior renovation of apartment 14a on the 14th floor. no change to use, egress, or occupancy.
General construction work associated with the renovation of an existing 3rd floor apartment. There is no change to use, egress, or occupancy proposed.
Plumbing work associated with the renovation in unit 6a/b, including the removal/replacement and relocation of existing fixtures, and the addition of new fixtures and finishes. no…
Plumbing filed in conjunction with interior renovation of apartment #9C. No change in use, occupancy or egress.
Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a…
Installation of temporary structural fountain cover,100psf rated for special event use.no alt to exist structures for the special event structural fountain cover. TPA permit requir…
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this…
Rremodel apt 2c on the second floor. no change in use, egress or occupancy.