754 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
754 permits
Mechanical work associated with unit 8a on the 8th floor renovation.
Interior renovation of existing unit 16a on the 16th floor. mechanical work. no change in use, occupancy, egress or bulk.
Interior renovation of apt. 28de with minor demolition. remove non load bearing partitions per plans. no change in egress, occupancy or use is involved under this application.
Mechanical changes on the 1st floor as indicated on drawings.
Interior renovation on existing apartment 8a on the 8th floor as per plans. millwork, flooring, kitchen and bathroom finishes . no change in occupancy, use or egress. plumbing,mech…
Construction of a house of workship on subcellar, cellar, and ground floor within a core andshell area of an existing building, together with associated offices and other support s…
Interior renovation of existing unit 16a on the 16th floor. plumbing scope. no change in use, occupancy, egress or bulk.
Renovation of existing apartment # 16E on the 16th Floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or…
Architectural changes on the 1st floor as indicated on drawings.
Structural work associated with renovation of unit 8a on the 8th floor.
Renovate Apt. 25H, renovate kitchen, renovate bathroom, modifications to non structural partitions, upgrade finishes throughout. No change to use, egress or occupancy Sub Doc S1 to…
Installation of ventilation and heating solution for pump room.
(PL) Install three (3) fully operational gas fired water heaters, and all related equipment and piping as per plans.
Non-structural demolition & renovation of apartment 9c on 9th floor. gen. construction work includes kitchen and minor partition work. replacing kitchen sink, appliances, cabinetry…
Installation of temporary roof protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applic…
Plumbing changes on the 1st floor as indicated on drawings.
Partial interior demolition at 1st floor restaurant space. no change egress, occupancy or use.
Interior plumbing with the renovation of apartment 3d on the 3rd floor. as per plans filed herewith. no change of use, egress, or occupancy.
Interior renovation of existing unit 16a on the 16th floor. general construction scope. no change in use, occupancy, egress or bulk.
Installation of sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy…