754 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
754 permits
The project scope of work includes the installation of vestibulee electric air curtain. There is no change in occupancy, scope, or egress
install two (2) new gas fired water heaters, piping, floor and area drains and all related work as per plans.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Combine two apartments Remove and install interior partitions , finishes etc. The work also includes minor masonry openings facing the rear courtyards to accommodate the mechanical…
Associated plumbing work for renovation to unit 8a on the 8th floor.
Filing for mechanical systems work as per plans
Renovation of existing bathrooms and kitchen. interior demo and construction of non-bearing partitions. no change to use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Mechanical work in the existing unit #10F on the 10th floor. Initial general construction application and subsequent plumbing application to be filed. All per submitted plans. No c…
Construction of partition per plans, replacement of existing plumbing fixtures in same location. no change to use, egress, or occupancy.
Sprinkler modifications on 7th Floor as shown on plans filed herewith. No change in egress, occupancy or use.
7G West Wing ADA Patient room Upgrade - Plumbing modifications as shown on plans filed herewith. No change in egress, occupancy or use.
Installation of temporary needle beams as per plans. needle beams shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Masonry facade repairs as required by Unsafe cycle 9 FISP report as per plans. No change in use, egress or occupation.
MSW- 4F ENABLING FOR SURGICAL EXPANSION - Sprinkler modifications of the 4th floor as shown on plans filed herewith. No change in egress, occupancy or use.
Plumbing work filed in conjunction with apartment#3R renovation.
Interior renovation of existing unit 16a on the 16th floor. mechanical work. no change in use, occupancy, egress or bulk.
Renovation of existing apartment # 16E on the 16th Floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or…
Renovate Apt. 25H, renovate kitchen, renovate bathroom, modifications to non structural partitions, upgrade finishes throughout. No change to use, egress or occupancy Sub Doc S1 to…