955 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
955 permits
At subcellar, installation of new ac units and associated ductwork and piping, supplemental ac unit to serve it room, and new outside air and exhaust fans as per plans filed herewi…
Removal of abandoned water tank and installation of plumbing fixtues in existing 6th floor stair bathroom/locker room. No change in occupancy, use or egress.
Debris chute for the interior demolition of 14-story commercial building
2nd floor interior renovation combining one dwelling unit and one store into a single residential unit. Work includes non-load-bearing partitions, mechanical, plumbing and electric…
Equipment use for interior demolition of 14-story commercial building
At subcellar, removal and installation of interior partitions, ceilings, finishes, millwork, and interior convenience stairs as per plans filed herewith. no change to use, occupnac…
replacement of two water closets, two lavatories, one bath tub, one gas range, one kitchen sink and one washing machine on new roughing, minor relocation of one dishwasher.
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01180602-I1.. Cut/cap standpipe riser floor by floor as required. No change to…
Upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Interior renovation of apartment 10x minor demolition of non-load bearing partitions, painting & finishes. no change to use, egress or occupancy. all as per plans and applications.
Remove part of ceiling and reconfigure access panel in mech closet. Provide new suspended ceiling. New access panel. No change in use, egress or occupancy
Hereby filing general construction work at 36th floor unit 36c as per plans. no change in use, egress, occupancy
Addition/Modification to existing HVAC System as per plans filed herewith. No change in use, occupancy or egress.
Installation of 8 unit split system on the roof and floor with a total capacity of 8 tons. no change to egress, use, or occupancy.
Interior modification of unit 25a including the modification of the kitchen, bathrooms, and finishes throughout. no change in use occupancy or egress is proposed in this applicatio…
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
At cellar and 1st floor, installation of new ac units and associated ductwork and piping, supplemental ac unit to serve it room, and new outside air and exhaust fans as per plans f…
At cellar and 1st floor, removal and installation of interior partitions, ceilings, finishes, millwork, and interior convenience stairs as per plans filed herewith. no change to us…