955 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
955 permits
At cellar and 1st floor, installation of new ac units and associated ductwork and piping, supplemental ac unit to serve it room, and new outside air and exhaust fans as per plans f…
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Addition/Modification to existing HVAC System as per plans filed herewith. No change in use, occupancy or egress.
Hereby filing general construction work at 36th floor unit 36c as per plans. no change in use, egress, occupancy
Remove part of ceiling and reconfigure access panel in mech closet. Provide new suspended ceiling. New access panel. No change in use, egress or occupancy
Interior modification of unit 25a including the modification of the kitchen, bathrooms, and finishes throughout. no change in use occupancy or egress is proposed in this applicatio…
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Installation of 8 unit split system on the roof and floor with a total capacity of 8 tons. no change to egress, use, or occupancy.
At cellar and 1st floor, removal and installation of interior partitions, ceilings, finishes, millwork, and interior convenience stairs as per plans filed herewith. no change to us…
Renovate existing kitchen and master bathroom at Apt 9B. Minor interior non-bearing partitions and millwork. New drop ceilings. New thru-wall openings for AC condensing units.
Provide new duct layout changes to the existing HVAC system in conjunction with Alt # M01343640 as per plans filed
mechanical modifications throughout
General construction work is proposed in the existing unit #10F on the 10th floor. Subsequent plumbing and mechanical applications to be filed. All per submitted plans. No change t…
Replacement (1) new gas fired hot water heater with integral burner in the sub-cellar. reconnect low pressure gas line, existing storage tanks. remove (1) boiler. no change in mean…
Plumbing work in apartment 3c in conjunction with apt renovation in dob now job#m01314103. no change in use, egress or occupancy.
Hereby filing for the removal. replacement, relocation and installation of new plumbing fixtures in apartment 5c located on the fifth floor. no change to use occupancy or egress.
Plumbing work associated with the renovation of apt 10x. all as per plans and applications. no change in use, egress or occupancy.
Replacement (1) new gas fired hot water boiler. (hallways) no change in means of egress use group or occupancy.
Herewith filing for Structural modifications as per plans. No change to use, egress or occupancy.