968 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
968 permits
Filing herewith drawings to install new exhaust ducts for proposed gas dryers. this application does not require a new or amended certificate of occupancy as there is no change in…
MSW- 4F ENABLING FOR SURGICAL EXPANSION - plumbing modifications of the 4th floor as shown on plans filed herewith. No change in egress, occupancy or use.
Subsequent application filed for installation of new sump pump in elevator pit. No change to egress or occupancy
Remove existing and replace with new roof mounted cooling tower, exhaust fan in penthouse, chiller in basement and water pumps in basement., and Install new associate piping as sho…
Application filed for interior modification and elevator modernization as per plan. no change in use, egress or occupancy.
Installation of ventilation system on the first floor as per plans filed. no change to use, egress or occupancy.
Installation of temporary roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Proposed structural modification of an existing concrete shear wall to accommodate a new door opening.
Mechanical work in conjunction with interior renovation of Apartment 2B Job No. M01313254-I1. Work includes addition of one exhaust vent in bathroom. No change in use, egress, or o…
Installation of a temporarily supported scaffold, overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a…
Alt-2 filing. plaza and garage repairs. no change in use, egress, or occupancy.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Modifications to existing structural dunnage framing at the basement and roof level to accommodate mechanical unit support.
Interior renovation of existing office space, partitions and drop ceilings on the 14 floor (14 fl marketed as 15) as per plans filed no change in use occupancy or egress
Plumbing work type as per plans