955 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
955 permits
General construction work as shown on plans
Structural work associated with renovation of unit 8a on the 8th floor.
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Mechanical work associated with unit 8a on the 8th floor renovation.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at west 60th street and west 61st street elevations.
Filing herewith general construction for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No…
Interior renovation on existing apartment 8a on the 8th floor as per plans. millwork, flooring, kitchen and bathroom finishes . no change in occupancy, use or egress. plumbing,mech…
Filing herewith landscape scope for non-structural demolition aka removal scope of planters, benches, trees, etc. at garage roof - plaza level (Damrosch Park) as per plans. No chan…
Filing for mechanical systems work as per plans
Roof evaluation and maintenance. No change in use, egress, or occupancy as a result of this application.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this ap…
Filing herewith architectural scope for the removal of the historical Guggenheim bandshell. No change in use, occupancy, or egress under this application.
The scope of work is to file the operation of AC-1 as the heating and air conditioning unit for the residence.(this will allow CON-ED to reconnect the gas to allow the unit to heat…
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Roof evaluation, structural repairs, and maintenance. Remove and replace roof structure at base of upper dome. No change in use, egress, or occupancy as a result of this applicatio…
Installation of new exhaust fan and associated duct work and specialties.
Pl fixtures filed in conjunction with dob no gc/ms. no change to use, occupancy or egress.