955 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
955 permits
Interior modification of unit 25a including the modification of the kitchen, bathrooms, and finishes throughout. no change in use occupancy or egress is proposed in this applicatio…
Interior Renovation of Apt. 12D on the 12th floor, including one sink replacement at same location and one sink relocation. No chage to egress, use or occupancy. The proposed work…
Renovation of an existing apartment #3R on the third floor. Work includes non-structural demolition and general construction as per plans file herewith.
Remove and install ductwork associated with new tenant layout for Alo per plans filed herewith. no change in egress, use or occupancy.
Reconstruction of Kitchen and Bathrooms and other minor work to conform to the original approved plans DOB Job #122854143. No change to use, egress or occupancy.
Filing herewith administrative application illustrating structural slab openings at lower and upper concourse and at garage roof/plaza level (at Damrosch Park) to make way for new…
Modification of mechanical systems on parts of Sub Cellar, Cellar, mezzanine, 23, 24, 51, 52 and Roof as indicated on attached plans. There is no change in occupancy, use or egress…
Architectural modifications to duplex unit #28/29c. no change to use, egress, or occupancy.
Interior renovation of apartment 7q on the 7th floor. no change in use, egress, or occupancy.
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
General plumbing modification for gas distribution as per plans filed herewith. No change to use, bulk, egress, or occupancy is proposed.
Recladding of non-illuminated non-advertising accessory retractable awning approved under nyc landmark preservation commission lpc-26-07069 - original belgian chocolate. no change…
Installation of outriggers for facade repair and inspection
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Exterior restoration: limestone unit replacement, limestone patching, soft joint replacement, cast stone patching, new flashing and waterproofing at 6/f setback and misc. repairs a…
Mount Sinai West: 7G West Wing - Interior Modifications on 7th Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress…
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of heavy-duty sidewalk shed for repairs as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 20…