955 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
955 permits
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Exterior restoration: limestone unit replacement, limestone patching, soft joint replacement, cast stone patching, new flashing and waterproofing at 6/f setback and misc. repairs a…
Installation of heavy-duty sidewalk shed for repairs as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 20…
Application to combine Apt #: 1C & 1D (1st floor) into one Apartment with minor renovation as per plans. No change in use, egress or occupancy in compliance with Technical Policy a…
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Mount Sinai West: 7G West Wing - Interior Modifications on 7th Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Interior renovation of apartment 1120 on the 11th floor. no change in use, egress, or occupancy.
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewit…
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Provide plumbing work for general construction performed under this application Doc #I1. Revise Schedule B, Gas Riser Diagram and Plans - no change in fixture count under this PAA.
Installation of temporary work platform as per plan. no change in use, egress, or occupancy. the work platform on the 17th floor at the southeast corner allows customers to land th…
Installation of temporary roof protection/overhead protection as per plan. no change in use, egress, or occupancy. the roof protection and overhead protection at the east neighbor'…
Replacement of existing exterior doors with same in same location as per plans filed herewith. No change in egress, use or occupancy.
Erect non-illuminated accessory business banner for equinox
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the south (west 63rd st) and west elevations from the top of the s…