754 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
754 permits
Herewith filing for sprinkler/ standpipe modifications as per plans. no change in use, egress or occupancy.
Plumbing work related to the interior renovation of apartment 1120 on the 11th floor. no change in use, egress, or occupancy.
Demolition of ductwork and new installation of ductwork, Fire Dampers, and Aire Devices serving new Battery Cabinet area in the Sub-Cellar tenant space (Whole Foods Market). No cha…
Herwith filing for renovations of existing bathroom fixtures in its entirety. provide new domestic cold water, hotwater, sanitary, and vent connections as per plans. no change in u…
At apartment 20q, removal and installation of interior non bearing partitions and finishes as per plans filed herewith. no change in use, occupancy or egress.
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…
Rough and finish plumbing changes.
At apartment 20q, installation of condencing units and related ductwork as per plans filed herewith. no change in use, occupancy or egress.
Propose new gas piping branch on 7th floor with gas shut-off valve connecting to existing riser which was filed separately(approved permitted & installed), providing gas to 1 ex. G…
Application for the temporary installation and use of a sidewalk shed as per plans herewith. no change in egress, use or occupancy.
Modify mechanical ductwork on cellar, 10th and 11th floor as shown.
Plumbing work on the cellar and 1st floor as indicated on drawings
install two (2) new gas fired water heaters, piping, floor and area drains and all related work as per plans.
Interior renovation of Apt. 7-102. Remove and install interior partitions doors, floors and finishes. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Partial Demo means & methods for interior demo and slab cut (plaza level only) as per plans.
Renovation of existing first floor eating and drinking establishment. work to include non structural demotion, partial ceiling replacement, new tile floor & counters and finishes t…
Plumbing work related to the interior renovation of apt. 1204 on the 11th and 12th floors. no change to use, egress, or occupancy.
Installation of construction fence for new building construction as per plans. no change in use occupancy or egress under this application. construction fence shall comply with cha…
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.