Other Permits in Manhattan, New York
11,312 other permits filed recently
11,312 permits
Mechanical modifications to the 9th and 10th fl as per plans filed herewith. No change in use, egress, or occupancy.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.
Filing herewith mechanical application to replace 2 rtu and 16 air handlers for cap one bank. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Replacement of one water source heat pump.
Installation of a temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Filing for mechanical work at unit 10A on the 10th floor. No change to use, egress, or occupancy.
Modifications to existing mechanical system for suite 2410.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
Supported Scaffold installation as per plans filed herewith.
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Ps 470m, installation of +/- 14 linear feet of chain link fence in conjunction with dob # m00644312 on behalf of contractor. no change in use, egress, or occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Propose installation of (1) air-cooled package unit (10th flr) with associated ductwork (7th & 10th floor). No change to use, egress or occupancy.
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. No change to use, egress or occupancy.
M460, installation of scaffold / stair tower inconjunction with dob # m00594556 on the contractor's behalf. no change in use or occupancy.
Sprinkler modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Filing for sprinkler work associated with interior demo of 24th & 25th floors as per plans submitted herewith. no change to use, egress, or occupancy.