Other Permits in Manhattan, New York
11,312 other permits filed recently
11,312 permits
Suspended scaffold outrigger system for exterior facade restoration work at 1470 1st avenuemanhattanny 10075
Filing for sprinkler work associated with interior demo of 24th & 25th floors as per plans submitted herewith. no change to use, egress, or occupancy.
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Installation and use of temporary pipe scaffolding equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Non-illuminated non-advertising accessory storefront awning approved under landmark docket lpc-26-06498 - reinstein ross. no change of use, egress or occupancy.
Installation of industrial rope access for facade inspections.
Installation of industrial rope access for facade inspections.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Mechanical changes as indicated on plans.
Interior architectural modifications to duplex unit 9c/10c as per plans. no change to use, egress or occupancy.
Provide Lintel for wall penetrations. Provide house keeping pads for mechanical equipment.
M460, installation of scaffold / stair tower inconjunction with dob # m00594556 on the contractor's behalf. no change in use or occupancy.
Supported Scaffold installation as per plans filed herewith.
Mechanical changes as indicated on plans.
Architectural changes as indicated on plans.
Modifications to existing sprinkler system in apt. 11N as per plans filed herewith. No change in use, egress, or occupancy.