Other Permits in Manhattan, New York
11,312 other permits filed recently
11,312 permits
Interior demo of non load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
Filing herewith mechanical application to replace 2 rtu and 16 air handlers for cap one bank. no change in use, egress, or occupancy.
Structural Application filed for Structural framing for floors throughout, filed in conjunction with DOB BIS Alt I Appl # 121207452. No change to egress, occupancy or use.
Installation and use temporary supported scaffolding as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation and use of temporary pipe scaffolding equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Mechanical changes as indicated on plans.; including the installation of 4.5 TON Condensing Unit and (3) Split System AC Units.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Provide temorary core sprinkler protection (tcsp) in accordance with nycbuildings bulletin 2020-012.
Chny central sp: sprinkler modifications throughout the existing babies hospital central building as indicated on plans filed herewith.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications to existing mechanical system for suite 2410.
Filing for mechanical work at unit 10A on the 10th floor. No change to use, egress, or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
Mechanical changes as indicated on plans; including the Installation of (2) 34 TON AC Units .
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Ps 470m, installation of +/- 14 linear feet of chain link fence in conjunction with dob # m00644312 on behalf of contractor. no change in use, egress, or occupancy