Other Permits in Manhattan, New York
11,365 other permits filed recently
11,365 permits
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Soe/is293m - for support of excavation submitting on behalf of contractor, related dob number # m01020891,m01133344 no change in use,occupancy or egress
Installation of suspended scaffold for facade work or inspection
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application filed for mechanical additions/modifications on the partial 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
General Construction for mechanical systems removal as shown on plans submitted herewith. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar
Soe/is293m - for support of excavation submitting on behalf of contractor, related dob number # m01023321 ,m01133344 no change in use,occupancy or egress
Modifications to the existing standpipe system on the 34th floor as per plans. No change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Combine upper level apartment 2w with apartment 3w. work includes second floor framing new opening for spiral stairs and closing old staircase opening. no change in egress or occupancy.
Modification of existing sprinkler system to provide (11) new sprinkler heads and relocate (3) sprinkler heads due to architectural ceiling changes.
Remove existing metal and concrete equipment curbs. Provide new structural steel dunnage and curbs for new equipment and reinforce existing structural steel floor beams.
Mechanical modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Mechanical work as shown on plans filed herewith.
Modifications to an existing Sprinkler System on the 2nd floor
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.