Other Permits in Manhattan, New York
11,286 other permits filed recently
11,286 permits
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural modifications as per plans filed herewith new steel beams, new steel dunnage beams as per plans herewith. no change in use, egress, or occupancy.
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc buildin...
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Soe/is293m - for support of excavation submitting on behalf of contractor, related dob number # m01023321 ,m01133344 no change in use,occupancy or egress
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Remove existing metal and concrete equipment curbs. Provide new structural steel dunnage and curbs for new equipment and reinforce existing structural steel floor beams.
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
General construction modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
General construction modifications taking place on the 8th,9th floors as per drawings filed herewith. no change in use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping as part of lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Mechanical work for ING Financial on 10th and 11th floor
New stair opening at 17th Floor and new convenience stair between 16th & 17th Floors as shown on drawings. No change in use, egress or occupancy.