Other Permits in Manhattan, New York
11,285 other permits filed recently
11,285 permits
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc buildin...
Remove existing metal and concrete equipment curbs. Provide new structural steel dunnage and curbs for new equipment and reinforce existing structural steel floor beams.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Sprinkler modifications as per plans. no change in use, egress or occupancy.
Installation of mechanical systems including a new AC units, ducts and associated piping as per plans filed herewith. No change in use, egress or occupancy.
Combine upper level apartment 2w with apartment 3w. work includes second floor framing new opening for spiral stairs and closing old staircase opening. no change in egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping as part of lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed work @ Exposure 2/west and north elevation, crack running throughout exterior wall, Rebuild parapet & exposure 2, west elevation as per plans. Address DOB Violation 010626CFA0301EM, 01062026F...
Remove wall and floor finisheds and install new wall and floor finishes, replace concierge desk , in Lobby. No change to use egress or occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Remove existing AC units, ductwork and associated components.
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.