Installation of temporary suspended scaffold equipment
Sprinkler modifications as per plans. no change in use, egress or occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Hereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of new non-load bearing partition and door. No change in use, egress or occupancy. (Executive Office Security Upgrades).
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Minor partition and lighting work in suite 301. No change to use, egress or occupancy.
Mechanical modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Fabrication and installation of 2nd floor fire balcony at front of existing building, to comply with existing second means of egress for the building.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Refurbishment of existing lobby court yard windows. Existing frames to remain, replacement of glass and mullions only.
Hereby filing to install mechanical units with associated ductwork and piping as part of lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Combine upper level apartment 2w with apartment 3w. work includes second floor framing new opening for spiral stairs and closing old staircase opening. no change in egress or occupancy.
Temporary structures for The Shed cultural and event programing. Removed at the end of the programing. No changes to existing structures, use or egress
Structural modifications as per plans filed herewith new steel beams, new steel dunnage beams as per plans herewith. no change in use, egress, or occupancy.
Soe/is293m - for support of excavation submitting on behalf of contractor, related dob number # m01020891,m01133344 no change in use,occupancy or egress
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.