Plumbing Permits in Manhattan, New York
4,150 plumbing permits filed recently
4,150 permits
5B: Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy
New plumbing fixture per plan for existing commercial space. No change in use, occupancy or egress.
Renovation of exist. duplex lower and upper level penhouse appartment located on 10th and 11th floor. new finishes as per plans submitted. structural , plumbing , meachanical , sprinkler work filed un...
Modification and installation of plumbing fixtures.
Sprinkler and Plumbing modifications taking place on the Cellar and 1st floors as per plans filed herewith. No change in use, egress or occupancy.
DON NOW FILING FOR PLUMBING WORK TO BE FILED IN ORDER TO OBTAIN BLUE CARD FOR CON EDISON RESTORE THE GAS. EXISTING FIXTURES AND GAS LINE. NO CHANGE TO USE OR OCCUPANCY. PAA to comply with inspectors o...
Application filed for plumbing modifications/additions on the 23rd floor as per plans filed herewith. no change in use, egress, or occupancy.
CHNY Ped ED: Sprinkler and Plumbing modifications to accommodate alterations to the Pediatric Emergency Dept. within the existing hospital building. No change to zoning, use, egress or occupancy.
Replace existing trim, water supply tubes, traps and another appurtenances to complete a new install of Bathroom, Kitchen and Washer Dryer Closet as part of Interior Renovation of Apartment 5G. No cha...
Herewith file plumbing plans for existing duplex unit 16G on 15th and PH FL. remove and replace all kitchen plumbing fixtures, remove, replace, cap all plumbing fixtures filed in conjunction with gc....
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
AT 35th floor tenant space and bathrooms, removal of plumbing lines and fixtures. At bathrooms, Installation of Plumbing Lines and fixtures as per plans filed herewith. No change to use, occupancy, or...
Filing herewith plumbing work for interior renovation of Apartment 6C at the address noted. No change in use, egress, or occupancy.
Refiling of Plumbing Work to Renovate Apt #4. Plumbing work to include Fixtures Replacement and Repair to leaking Branch Line. Scope of work is to remove violations. PAA1 is to add Gas Range.
Respectfully request to file for the replacement of appliance values & lock wings as noted on drawing set. No change in use, egress, or occupancy.
Application being filed under TPPN #3/97 to combine apartments 4B and 4B on the 4th Floor. Work to include removal of kitchen and capped at 4B to have 1 open kitchen. No change in use, egress, or occu...
Herewith filing Plumbing work and modifications to existing Sprinkler system in conjunction with office renovations.
Plumbing work filed in conjunction with the alteration CO application as per plan. No change in use, egress, or occupancy.
interior plumbing work on 26th and 27th floors as shown herewith.
Renovation of kitchen, powder room and bathroom. no change of use, egress, or occupancy.