Plumbing Permits in Manhattan, New York
4,150 plumbing permits filed recently
4,150 permits
Installation of new water fixtures and relocation.
L4 CARDIOLOGY Phase 2: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 2, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR O...
Plumbing work as per plans.
Plumbing work in conjunction with a restaurant fit out.
Interior renovation of existing commercial space involved in plumbing & general constrution work as per plan filed herewith. no change in use, occupancy & egress.
Plumbing modification to existing apartment 8ORT as per plans
Interior renovation proposed in existing unit #2C on the 2nd and 3rd floor. Subsequent plumbing application to be filed. All in accordance with submitted plans. No changes to use, egress or occupancy...
Perform plumbing modification work in conjunction with apt#2c renovation. remove, relocate and replace plumbing fixtures. general construction work filed under initial application. no change to use, e...
BLDG#12_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pip...
Interior renovation of existing apartment 29a including minor layout changes. replace of plumbing fixture. no change in use, egress and/or occupancy.
BLDG#11_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pip...
Plumbing work for the renovation to existing units 20b, 26b, 28b, 31b, 35b, 38b, 39b, 39a including ordinary repairs to bathrooms as per plans filed herewith. no change in use, egress, or occupancy.
BLDG#10_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pip...
BLDG#8_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pipi...
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st and 2nd floors. Subsequent plumbing application to be filed. All in accordance with plans. No cha...
Plumbing System Modifications and new installations related to Restaurant fit out.
Replace plumbing fixtures with new at existing roughing (25 lav, 25 wc), cap & remove (25 tubs), and install new plumbing fixtures at new roughing (25 showers) on the 5th floor.
Installation of new two piece bathroom in cellar, no change tu use, occupancy or egres sunder this application.
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Plumbing work proposed in existing unit #9A on the 9th fl. Initial General Construction and subsequent Mechanical applications to be filed. All per submitted plans. No changes to use, egress, or occup...