Plumbing Permits in Manhattan, New York
4,150 plumbing permits filed recently
4,150 permits
Plumbing work in association with mechanical filing m01348791. no change to egress, use, or occupancy.
Perform demolition of existing plumbing fixtures. furnish and install new plumbing fixtures and fittings at bathrooms and kitchen. perform plumbing modification work in conjunction with apt #6a renova...
Prop. plumbing work associated with renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egr...
ALTERATION TYPE I - INTERIOR RENOVATION OF EXISTING 4 STORY DWELLING. NEW PLUMBING AND MECHANICAL WORK. CHANGE OF OCCUPANCY AND USE, Conversion to a two-family dwelling. NO INCREASE IN BULK OR FAR. Mi...
Filing for the plumbing work in conjunction with the renovation of the Apt# PHB.
Hereby filing for the renovation of unit 3g (installation of plumbing fixtures). no change in use, egress or occupancy.
SB Shops: Modifications of sprinkler, standpipe, and plumbing piping and fixtures on cellar, basement and 1st floor in the existing hospital related building as per plans filed herewith only.
Subsequent filing to resolve inspector's objections on application # m01008543-s2 -s2.all mechanical and plumbing work are existing and filed under other job application listed on g-001.00.
Interior renovation of residential unit on the 3rd floor. removal of non-load bearing partitions and finishes.installation of new partitons and finishes throught along with new plumbing and mechanical...
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Propose plumbing work of existing mixed commercial and residential building on mezzanine as per plan. No change in use, egress, or occupancy.
Plumbing work in conjunctino with the interior renovation of apartment 10d located on the 10th floor. altering interior partitions within the existingresidential unit. no change in use, occupancy, or...
Hereby filing for the renovation of unit 3g (installation of plumbing fixtures). no change in use, egress or occupancy.
Relocation of existing gas meters from dwelling units to cellar- no change in use/occupancy, egress, room count/dwelling units
Propose plumbing work of existing mixed commercial and residential building on mezzanine as per plan. No change in use, egress, or occupancy.
Interior renovation of residential unit on the 3rd floor. removal of non-load bearing partitions and finishes.installation of new partitons and finishes throught along with new plumbing and mechanical...
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per plans. No changes to use eg...
Filing for the plumbing work in conjunction with the renovation of the Apt# PHB.
(cellar/ 1st/ 2nd/3rd floor) replace / install plumbing fixtures-as per plans -no change to egress use
Filing hrewith plumbing work on the 5th floor to remove existing classroom laboratories and associated fixtures and provide new lab sinks, sinks, emergency showers, and gas connections to the new clas...