Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
Renovation to existing units 20b, 26b, 28b, 31b, 35b, 38b, 39b, 39a as per plans filed herewith. all energy calculations for lighting filed under m01092673-i1. no change to use, egress, or occupancy.
This is the interior renovation of an apartment. There are no structural changes to the building and no change to use, occupancy, or egress.
Renovation of apt 10h. interior partition removal and construction related to renovation. no change to use, egress or occupancy.v
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings and finishes. this application will supersede application # 100485379
Exterior repairs include select brick masonry and terra cotta repairs as shown on drawings and as specified. no change in use, occupancy or egress.
Minor interior renovation inside residential unit on 3rd floor. add 2 closets per filled plan. no change in use occupancy or egress
Herewith Filing Modifications to Existing Mechanical Systems in conjunction with interior renovations of existing offices as per plans.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 5th fl (bathrooms) as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of apartment 9. No change to occupancy, use or egress.
Apartment renovation, including minor wall relocations, bathroom and kitchen replacement.
application filed for facade repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.
Suspended scaffold installation for Facade repair works
Installation of outriggers for facade repair and inspection
Initial cd5: inspection & fisp repairs per plans no change in use egress or occupancy
Suspended scaffold installation for facade repairs and inspections
Installation of suspended scaffolding for facade inspection/repair.
9th cycle FISP repairs. No change to use, occupancy or egress.
Amendment cd5: fisp repairs per plans . no change in use, egress or occupancy. adding new drops and work cage location options
Suspended scaffold installation for facade repairs and inspections