Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
Interior renovation on the cellar floor. no change of use, egress, or occupancy. prior designation of 6 to remain, alteration-co not required per bb 2025-002 and ac 28-118.3 exception
Suspended scaffold installation for facade repairs and inspections
Facade repairs for 13th floor setback conversion as per plans. No change to use, egress or occupancy.
Renovation of apt 14d filed in conjunction with dob now pl and mh. no change to use, occupancy or egress.
Renovation to existing units 20b, 26b, 28b, 31b, 35b, 38b, 39b, 39a as per plans filed herewith. all energy calculations for lighting filed under m01092673-i1. no change to use, egress, or occupancy.
Initial cd5: inspection & fisp repairs per plans no change in use egress or occupancy
INTERIOR RENOVATION OF APARTMENT UNIT 3i, ON 3RD FLOOR ONLY, CONSISTING OF PARTITIONS, GWB, TILE WORK AND COSMETIC FINISHES AS INDICATED. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
This application is an alteration application for the interior renovation of an existing combined dwelling units a & b on the 16th floor, use, occupancy and egress will not be altered.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Supported Scaffold in conjunction with Wingate Hall renovation.
Renovation of apt 10h. interior partition removal and construction related to renovation. no change to use, egress or occupancy.v
Suspended scaffold installation for Facade repair works
Installation of suspended scaffold for facade repairs.
Application filed for interior renovation of non-load bearing partitions, ceilings and finishes. this application will supersede application # 100485379
Apartment renovation, including minor wall relocations, bathroom and kitchen replacement.
Filing for repairs to this existing parking garage. No change to use, egress or occupancy.
Interior renovation of office floor for non load bearing partitions and related finishes
Installation of outriggers for facade repair and inspection
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Garage repairs as per plans submitted herewith. there is no change in use, egress or occupancy.