Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
Minor modification to interior non-load bearing partitions for apartment renovation. No change to occupancy, use or egress.
interior renovation for dwelling unit #2 in existing residential building. no change in bulk , use, occupancy or egress of building is proposed under this application.
FILING PL/SP FOR 8th FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. SPRINKLER HEADS AS PER PLAN.
FILING GC FOR 8TH FLOOR INTERIOR RENOVATION, Construct New Offices, Pantry as per Plan. NO Change in use, Egress, or Occupancy
Mechanical work performed in conjunction with Interior Renovations of Apartment Unit 10C. No Change to Use, Egress or Occupancy under this application.
Hereby filing for the interior renovation of apartment 3r located on the 3rd floor. no change to use, egress or occupancy.
Herewith filing for interior architectural renovations on the 5th flr - apt 5a unit per plans. no change in use, occupancy or egress under this appplication.
Scope of work will include interior renovation Assembly , partitions installations flooring finishes , mill work ,doors as indicated on plans. No change in use , egress or Occupancy
Interior renovation as per plans filed herewith.
Removal and installation and interior partitions for apartment renovation as per plans
Installation of ouriggers for facade repair and inspection
Application to file additional facade repairs, and existing window repairs. no change in use, occupancy or egress.
Demo and general construction work in conjunction with office renovation
Equipment use (56 st hoists): installation of dual 7000# capacity personnel hoists during bldg alteration filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egres...
Facade repair/replacement to include masonry, pointing, caulking, lintels, sills, terracotta, and coping stone.
Interior renovation of an existing class a apartment including new flooring, cabinetry, fixtures, doors, dropped ceiling, and partitions as per plans filed herewith. no change in use, egress, or occup...
Alterations to existing PL/SP Systems as per plans filed herewith
Installation of suspended scaffold during facade inspection / repair and Hoist
Mechanical work filed in conjunction with renovation of existing apartment 15a. install new dx split system for the kitchen. no change to use, egress or occupancy.
Renovation of accessory recreation room on basement floor as per determination control number 74647