Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
FILING PL/SP FOR 8th FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. SPRINKLER HEADS AS PER PLAN.
Facade repairs: which include terra cotta stone replacement, stone repairs, masonry replacement. No change to use, egress or occupancy
Facade repairs to include masonry, pointing, sills, terracotta units, and partial parapet reconstruction.
Interior renovation of an existing class a apartment including new flooring, cabinetry, fixtures, doors, dropped ceiling, and partitions as per plans filed herewith. no change in use, egress, or occup...
Facade repairs, scaffold inspections, 3 men letter
Structural work filed in conjunction with apartment on the third floor renovation.
Proposed enlargement of an existing 4-story building with basement and cellar. excavated in cellar, horizontal extension in bas and 1st fl. convert multi-fam to 1-fam. interior renovation at bas, cel,...
Alterations to existing PL/SP Systems as per plans filed herewith
Herewith filing phase d architectural renovations per plans. no change in use, occupancy or egress under this application.
Mechanical work filed in conjunction with apartment#14B renovation.
Interior renovation and mechanical hood of for commercial kitchen at 001 stall#s6, and basement floor #c3, as per plan filed herewith. no change in use, egress or occupancy.
Suspended Scaffold for facade repair as shown on plans
Interior renovation as per plans filed herewith.
Facade repairs to include masonry, pointing, sills, terracotta units, and partial parapet reconstruction.
Herewith filing mechanical modifications in conjunction with phase d renovations per plans. no change in use, occupancy or egress under this application.
Removal and installation and interior partitions for apartment renovation as per plans
Erect, maintain & dismantle of scaffold for facade repairs per drawings attached herewith
Equipment use (56 st hoists): installation of dual 7000# capacity personnel hoists during bldg alteration filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egres...
Herewith filing structural modifications in conjunction with phase d renovations per plans. no change in use, occupancy or egress under this application.
Suspended scaffold installation for facade repairs and inspections