HVAC Permits in Queens, New York
395 hvac permits filed recently
395 permits
Installing three (3) new Navien boilers and one (1) hot water heater in the cellar.
Sub-sequence file boiler application for plumbing job # q00863714.
mechanical filing for installation of hvac system with associated ductwork for tenant space #6 (77-39 Vleigh Place)
Sub-sequence file boiler application for plumbing job # q00863714.
Install 1 new boiler
Plumbing work limited to renovate existing kitchen, bathrooms, laundry., boiler room, drywell at an existing one family house, two stories and basement
Modification of the HVAC distribution and controls as shown in the drawings filed herewith.
Q018, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 42190...
Install new hvac 5 tn mini split unit for a first floor commercial space and (2) hvac mini split units for exist (2) apartments at second floor.
Install 1 new boiler
Plumbing work limited to renovate existing kitchen, bathrooms, laundry., boiler room, drywell at an existing one family house, two stories and basement
Install new hvac 5 tn mini split unit for a first floor commercial space and (2) hvac mini split units for exist (2) apartments at second floor.
Modification of the HVAC distribution and controls as shown in the drawings filed herewith.
Ps-284 clearview pump station reconstruction hvac work includes new hvac equipment (exhaust fans, supply fans, associated ducting, air conditioning , and unit heaters) for new above grade pump station...
HVAC system installation, Contract TI-168 to rehabilitate & upgrade the headworks of the Tallman Island WRRF. Systems comprise of heating & ventilation units, exhaust fans, hot water coils, hydronic p...
Full interior gut renovation with all new non-load bearing partitions, doors, sheetrock, bathrooms, kitchens and finishes on 1st and 2nd floors. new bathroom and boiler rm in cellar. existing structur...
Filing for hvac units for commercial space fit out as per plans filed herewith in conjunction with alt2# 421945140. no change in egress, use or occupancy.
Full interior gut renovation with all new non-load bearing partitions, doors, sheetrock, bathrooms, kitchens and finishes on 1st and 2nd floors. new bathroom and boiler rm in cellar. existing structur...
Filing for hvac units for commercial space fit out as per plans filed herewith in conjunction with alt2# 421945140. no change in egress, use or occupancy.
Q018, installation of temporary chimney, steam, condensate & makeup water pipings to connect temporary boiler during renovation of main building heating plant in nyc public school. no change in use, e...