HVAC Permits in Queens, New York
392 hvac permits filed recently
392 permits
Provide concrete pads for mechanical and plumbing equipment, openings and reinforcement for boiler rigging and ventilation.
Filing to address ecb violations 3546158l;35563530y. removal of non-load bearing partitions. removal of kitchenette. legalize 3 fixture bathroom and laundry room. enclose boiler with 1 hour rated part...
Filing to address ecb violations 3546158l;35563530y. removal of non-load bearing partitions. removal of kitchenette. legalize 3 fixture bathroom and laundry room. enclose boiler with 1 hour rated part...
Provide concrete pads for mechanical and plumbing equipment, openings and reinforcement for boiler rigging and ventilation.
Replacement of existing webster burner with new dual fuel weishaupt burner in mobile boiler trailer unit # 01. the existing mobile boiler trailer was filed with nyc dob under dob # 421020102. no chang...
Replacement of existing webster burner with new dual fuel weishaupt burner in mobile boiler trailer unit # 02. the existing mobile boiler trailer was filed with nyc dob under dob # 421020111. no chang...
Mechanical systems associated with boiler replacement.
Remove & replace concrete pad for equipment. new structural steel boiler access platform and ladder for boilers.
Ps 079q, installation of temporary chimney, steam, condensate, and water piping to connect temporary boiler during renovation of main building heating plant in nyc public school in conjunction with do...
Replacement of existing webster burner with new dual fuel weishaupt burner in mobile boiler trailer unit # 02. the existing mobile boiler trailer was filed with nyc dob under dob # 421020111. no chang...
Replacement of existing webster burner with new dual fuel weishaupt burner in mobile boiler trailer unit # 01. the existing mobile boiler trailer was filed with nyc dob under dob # 421020102. no chang...
CelL: 2pc bathroom, 2 new combo boilers,AD,FD. First fL: Relocate kitchen (gas stove, sink) relocate 1 bath , add new 3pc bath, propose W. machine, gas dryer and D. washer. Second fl: Relocate kitchen...
To install new ductworks and air devices throughout the space and connect to existing HVAC units and Mechanical work for the exhaust hood in the commercial kitchen of an eating and drinking establishm...
Herewith filing subsequent fuel storage document for NB generator
Installation of ductless air conditioning system- no change in use/occupancy, egress, room count/dwelling units
To install new ductworks and air devices throughout the space and connect to existing HVAC units and Mechanical work for the exhaust hood in the commercial kitchen of an eating and drinking establishm...
Herewith filing subsequent fuel storage document for NB generator
Installation of ductless air conditioning system- no change in use/occupancy, egress, room count/dwelling units
Proposed vertical and horizontal to existing two story and cellar, one-family dwelling. interior renovation. new partitions, finishes, doors, windows, kitchen cabinets, and new hvac as per plan
Remove existing fuel oil storage tank as per plans. no change in use, egress or occupancy.