1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change in use, egress or occupancy.
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change in use, egress or occupancy.
Installation of hvac to lead nb application
Installation of hvac to lead nb application
Installation of new hvac & erv systems associated with nb application filed under initial filing
Replacement of exhaust pipe for HVAC equipment. The structural work consists of providing supports for the exhaust pipe.
Installation of new hvac & erv systems associated with nb application filed under initial filing
Replacement of exhaust pipe for HVAC equipment. The structural work consists of providing supports for the exhaust pipe.
Plumbing work on existing roughing in cellar including relocation of existing meter bar from cellar to OSP, replacement of furnace, tankless hot water heater. All work performed on existing gas piping...
Herewith filing to replace split-system air conditioning units, cooling coils and upgrade HVAC controls as per the drawings. No change in use egress or occupancy
Plumbing work on existing roughing in cellar including relocation of existing meter bar from cellar to OSP, replacement of furnace, tankless hot water heater. All work performed on existing gas piping...
1)installation of gas furnace with split system dx coil for heating and cooling. 2)installation of split-system heat pump unit for heating and cooling of 3rd floor bedroom.3)installation of exhaust an...
1) installation of gas furnace with split system dx coil for heating and cooling. 2) installation of split-system heat pump unit for heating and cooling of 3rd floor bedroom. 3) installation of exhaus...
1)installation of gas furnace with split system dx coil for heating and cooling. 2)installation of split-system heat pump unit for heating and cooling of 3rd floor bedroom.3)installation of exhaust an...