HVAC Permits in Staten Island, New York
144 hvac permits filed recently
144 permits
Replace existing air handling units, exhaust fans, return fan, VAV boxes, unit ventilators and fan coil units . Balance airflows in existing classrooms to match existing design CFM. Replace existing H...
Relocate existing bathroom fixtures on the first floor, relocate fixtures on the second floor and replace boiler and hot water heater with new combi-boiler on the first floor.
Relocate existing bathroom fixtures on the first floor, relocate fixtures on the second floor and replace boiler and hot water heater with new combi-boiler on the first floor.
Filed herewith for mechanical work, including modifications to existing hvac ductwork, new walk-in box condenser and evaporator units, and new kitchen hood with associated ductwork. no change to use,...
R041, installation of temporary chimney, steam and condensate pipings and connect temporary emergency mobile boiler trailer to provide heat during heating season. no change in use, egress or occupancy...
Remove incinerator and cap existing flue. Install new flue lining in chimney. Remove existing thermostats throughout building and replace with new. Remove and replace ductwork, oil piping, vent piping...
Filed herewith for mechanical work, including modifications to existing hvac ductwork, new walk-in box condenser and evaporator units, and new kitchen hood with associated ductwork. no change to use,...
Propose to remove (2) 2,000 gallon and (1) 6,000 gallon underground storage tanks. No change in use, egress or occupancy.
Propose to remove (2) 2,000 gallon and (1) 6,000 gallon underground storage tanks. No change in use, egress or occupancy.
Installation of new hvac system associated with nb application filed under initial filing
Application filed in conjunction alt-co application to install new gas piping, gas boilers and plumbing fixtures all as per plans filed herewith.
HVAC in conjunction with two family alteration
Installation of new hvac system associated with nb application filed under initial filing
HVAC in conjunction with two family alteration
Application filed in conjunction alt-co application to install new gas piping, gas boilers and plumbing fixtures all as per plans filed herewith.
Installation of new hvac system associated with nb application filed under initial filing
Installation of new hvac system associated with nb application filed under initial filing
Laundromat demolition. work includes remove exist'g washers, exist'g dryers, exist'g h.w. boiler w/ tanks, exist'g sprinkler heads.
Ps 004r, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 50...
Laundromat demolition. work includes remove exist'g washers, exist'g dryers, exist'g h.w. boiler w/ tanks, exist'g sprinkler heads.