HVAC Permits in Staten Island, New York
146 hvac permits filed recently
146 permits
Hvac filing for 2-family residential house
Replace existing exhaust fans as mentioned on drawing M002.00. Replacement of HV units with AHUs as mentioned on drawing M002.00. Balance airflows in existing classrooms to match existing design CFM....
Remove incinerator and cap existing flue. Install new flue lining in chimney. Remove existing thermostats throughout building and replace with new. Remove and replace ductwork, oil piping, vent piping...
Remove incinerator and cap existing flue. Install new flue lining in chimney. Remove existing thermostats throughout building and replace with new. Remove and replace ductwork, oil piping, vent piping...
Remove ramp and access stair with two new stair access to boiler pit. Remove and Replace Concrete pads.
Remove ramp and access stair with two new stair access to boiler pit. Remove and Replace Concrete pads.
R034, installation of temporary echin, steam, condensate, and make-up water piping connected to temporary boiler submitting on behalf of the contractor in conjunction with dob # no change in use, egre...
R034, installation of temporary echin, steam, condensate, and make-up water piping connected to temporary boiler submitting on behalf of the contractor in conjunction with dob # no change in use, egre...
Install plumbing fixtures to accommodate a 4 family dwelling including electric water heater and boiler
Install plumbing fixtures to accommodate a 4 family dwelling including electric water heater and boiler
R009, installation of temporary chimney, steam, condensate and make-up water piping to a temporary mobile boiler trailer on behalf ofcontractor in conjunction with dob # 500875742 . no change in use,...
Ps 055r, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 50...
Installation of a split air conditioning system for supplemental cooling for the auditorium.
Bathroom exhaust & HVAC system in conjunction with construction as per the plans filed herewith
Bathroom exhaust & HVAC system in conjunction with construction as per the plans filed herewith
Installation of a split air conditioning system for supplemental cooling for the auditorium.
Hvac for new two family dwelling. FILED IN CONJUNCTION WITH NB APPLICATION.
R041, installation of temporary chimney, steam and condensate pipings and connect temporary emergency mobile boiler trailer to provide heat during heating season. no change in use, egress or occupancy...
Hvac for new two family dwelling. FILED IN CONJUNCTION WITH NB APPLICATION.
Remove and provide new split systems air conditioning units with outdoor condensing units. Replacing refrigerant piping for air handing unit. Remove and replace penthouse.