HVAC Permits in Staten Island, New York
146 hvac permits filed recently
146 permits
Respectfully requesting an amendment to PL plans to include replacement of section of existing sprinkler piping in the boiler room, & cellar floor plans, detail, & riser diagram revisions per recent c...
Legalize previously installed central air conditioning systems.all work completed no work to be performed.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
REMOVE EXISTING INTERIOR NON-LOAD BEARING PARTITIONS TO CREATE OPEN OFFICE AREA. nO CAHNGE TO USE GROUP, OCCUPANCY CLASSIFICATION OR MEANS OF EGRESS. NO CHANGE TO EXISTING HVAC OR PLUMBING SYSTEMS.
REMOVE EXISTING INTERIOR NON-LOAD BEARING PARTITIONS TO CREATE OPEN OFFICE AREA. nO CAHNGE TO USE GROUP, OCCUPANCY CLASSIFICATION OR MEANS OF EGRESS. NO CHANGE TO EXISTING HVAC OR PLUMBING SYSTEMS.
Legalize previously installed central air conditioning systems.all work completed no work to be performed.
Respectfully requesting an amendment to PL plans to include replacement of section of existing sprinkler piping in the boiler room, & cellar floor plans, detail, & riser diagram revisions per recent c...
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Hvac filing for 2-family residential house
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Hvac filing for 2-family residential house
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Renovation of an existing 2-family house. Installation of wall partitions, toilet room fixtures & kitchenette appliances. Installation of new water heater & boilers in the cellar.
Renovation of an existing 2-family house. Installation of wall partitions, toilet room fixtures & kitchenette appliances. Installation of new water heater & boilers in the cellar.
Propose to install Two gas fired boilers @ cellar in conjunction with ALT-2 GC #S01092223-I1,
Propose to install Two gas fired boilers @ cellar in conjunction with ALT-2 GC #S01092223-I1,
Plumbing work on exist. residential house with, install new boiler, h.w.h. as per plan. no change in use, egress or occupancy.
Plumbing work on exist. residential house with, install new boiler, h.w.h. as per plan. no change in use, egress or occupancy.
Install new hvac split system as per plans. no change in use, occupancy or egress
PLUMBING APPLICATION FILED IN ORDER TO INDICATE CONNECTION OF GAS AND WATER LINES TO REPLACEMENT OF 2 BOILER AT EXISTING PROPERTY, LOCATED IN 2nd FLOOR SPACE