Building Permits in ZIP 10005
Manhattan, NY — 315 permits filed recently
315 permits
Mechanical modifications on 20th floor (construction) / 21st floor (marketing). no change to use, egress or occupancy.
Interior renovation including partitions, finishes internal structural stair spanning (3) floors).
Modifications to building HVAC system on floors 27-29 (Construction designation) / 30-32 (Marketing designation)
Structural framing for new stair between floors 28-30 (30 - 32 marketing designation)
INTERIOR RENOVATION OF OFFICE FLOOR FOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES 20th FLOOR CONSTRUCTION/21st FLOOR (MARKETING). NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Mechanical modifications on 20th floor (construction) / 21st floor (marketing). no change to use, egress or occupancy.
Installation of 2 point angle scaffold for facade repair & inspection.
Conversion of floors 1-17 in existing 38 story building from office to residential use.
Conversion of floors 1-17 in existing 38 story building from office to residential use.
Partial interior alteration to existing bar: selective demo, basic bar millwork, limited non-load bearing partitions, minor floor/ceiling patching, and upgrades to two single user bathrooms. No change...
Plumbing fixture removal and replacement in kind for floors 2-17.
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoistsshall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under thisapplication. eleva...
Mechanical work associated with ALT-CO M01233357-I1.
Plumbing fixture removal and replacement in kind for floors 2-17.
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical work associated with ALT-CO M01233357-I1.
Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoistsshall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under thisapplication. eleva...
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold in the shaft from the cellar to the 22nd floor