Building Permits in ZIP 10005
Manhattan, NY — 315 permits filed recently
315 permits
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold in the shaft from the cellar to the 22nd floor
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Outriggers system installation for facade repairs. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Plumbing piping and new fixtures, and modifications to sprinkler piping and installation of sprinkler heads on partial 28th floor in the existing office building.
Installation of pipe scaffold, as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Plumbing fixture replacement, relocation & installation as per plans. no change to use, occupancy, egress or fire protection.
Outriggers system installation for facade repairs. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Plumbing piping and new fixtures, and modifications to sprinkler piping and installation of sprinkler heads on partial 28th floor in the existing office building.
Plumbing fixture replacement, relocation & installation as per plans. no change to use, occupancy, egress or fire protection.
Installation of pipe scaffold, as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
White box space with capped outlets for CW, Vent, Sanitary piping tied back to base building system. Modifications to the existing plumbing, sprinkler & standpipe systems No change in use, egress, occ...
White box space with capped outlets for CW, Vent, Sanitary piping tied back to base building system. Modifications to the existing plumbing, sprinkler & standpipe systems No change in use, egress, occ...
Sprinkler interior renovation of office floor for non-load bearing partitions and related finishes (constructon floor 24/25 - marketing floor 25/26)
White box space with capped outlets for CW, Vent, Sanitary piping tied back to base building system. Modifications to the existing plumbing, sprinkler & standpipe systems No change in use, egress, occ...
Sprinkler modifications on 14th floor (construction) / 15th floor (marketing). no change to use, egress or occupancy.
Plumbing modifications on 14th floor (construction) / 15th floor (marketing). no change to use, egress or occupancy.
Facade repairs throughout building envelope as indicated on elevation drawings
9th Cycle FISP Repair. No Change to Use, Egress or Occupancy.
Plumbing work associated with 1st floor restaurant renovations as per plans filed herewith. no change in use, egress or occupancy.
Plumbing interior renovation of office floor for non-load bearing partitions and related finishes (constructon floor 24/25 - marketing floor 25/26)