Building Permits in ZIP 10019
Manhattan, NY — 1,296 permits filed recently
1,296 permits
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Proposed exterior alteration for the renovation of the existing plaza. no change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy
Modifications to the existing sprinkler system on the 23rd Floor- (Orrick Buildout) as per plans. No change to use, egress or occupancy.
Renovation of existing commercial space on basement with plumbing work:new plumbing fixtures on basement as per plan; no change in use, egress or occupancy under this application.
Sprinkler modifications taking place on sub-cellar #1 (marketing b-2) as per plans filed herewith. no change in use, egress, or occupancy.
Slab infills, framing of new shafts, installation of supplementary steel framing to support kitchen equipment
Modifications to the existing sprinkler system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy
Sprinkler modifications and installation of temp loop sprinkler system (greystone (19c/20m)) as indicated on plans. no change in use, egress or occupancy.
Installation, removal, and relocation of sprinkler heads to accommodate new architectural layout.
Slab, beam and foundation wall repairs.
Structural garage on the Cellar and Sub-Cellar levels (LL 126 Garage Repairs) No change to use, egress or occupancy.
Sprinkler modifications and installation of temp loop sprinkler system (greystone (19c/20m)) as indicated on plans. no change in use, egress or occupancy.
Proposed exterior alteration for the renovation of the existing plaza. no change to use, egress or occupancy.
Sprinkler modifications taking place on sub-cellar #1 (marketing b-2) as per plans filed herewith. no change in use, egress, or occupancy.
Installation of material hoist (counterweighted system).
Installation, removal, and relocation of sprinkler heads to accommodate new architectural layout.
Modifications to the existing sprinkler system on the 23rd Floor- (Orrick Buildout) as per plans. No change to use, egress or occupancy.
Structural garage on the Cellar and Sub-Cellar levels (LL 126 Garage Repairs) No change to use, egress or occupancy.
Slab infills, framing of new shafts, installation of supplementary steel framing to support kitchen equipment