Renovation of existing commercial space in basement with general construction: install new partitions, floor/wall finishes. install new ada toilet as per plan. no change in use, egress or occupancy un...
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Modifications to the existing sprinkler system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy
Modifications to the existing sprinkler system on the 38th Floor (Prime Therapeutics) as per plans. No change to use, egress or occupancy.
Slab, beam and foundation wall repairs.
Modifications to the existing sprinkler system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy
Relocate Toilet, Lavatory, Shower, and replace kitchen sink in 2nd FL. Apt, 2R. PL work to be filed in conjunction with GC work M01299522-I1.
Modifications to the existing plumbing system on the 10th floor as per plans. No change to use, egress or occupancy.
Proposed plumbing work at partial 1st floor commercial space of eating & drinking establishment as per plan. No change in use, egress, or occupancy.
Renovation of existing restaurant, limited to new millwork, fixtures and finishes. No change in use egress or occupancy.
Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 16th Floor- (Orrick) as per plans. No change to use, egress or occupancy.
INSTALLATION OF 300 psf SIDEWALK SHED, OVERHEAD PROTECTION, ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR...
Installation of pipe scaffold as per plan. no change in use, egress or occupancy.
Herewith file plumbing plans to combine Apt. 10B and 10C, filed in conjunction with general construction. (sf for areas of plumbing work: kitchen 100 sf., pantry 55 sf., bathroom 52 sf, total 207 sf)
Mechanical: Modifications to the existing HVAC system on the 16th Floors- (Orrick) as per plans. No change to use, egress or occupancy.
Removal of plumbing fixtures and installation of new sprinkler heads as per plans filed herewith. No change to use, egress, or occupancy.
Plumbing modifications taking place on 37th floor constructon (38th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing sprinkler system on the 10th floor as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 16th Floor- (Orrick) as per plans. No change to use, egress or occupancy.