Building Permits in ZIP 10038
Manhattan, NY — 425 permits filed recently
425 permits
Interior renovation of existing commercial store at 1st floor. No change in use, occupancy or egress.
Providing new mobile ventless hood unit at existing movie theater. no physical work being done. no exterior or any other work to be done. there will be no change in use, egress or occupancy.
Providing new mobile ventless hood unit at existing movie theater. no physical work being done. no exterior or any other work to be done. there will be no change in use, egress or occupancy.
Filing to install temporary sidewalk shed as per plans filed.
Interior renovation of existing commercial store at 1st floor. No change in use, occupancy or egress.
Modification to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy.
Modification to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy.
This application is filed for a Temporary Use Permit for a sales office including model apartments on the 9th floor pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Filed in conjunction...
General construction to renovate apt 524 on the 5th floor. work will include new partitions & finishes, new wood flooring, and new plumbing fixtures. no change in use, egress, or occupancy under this...
This application is filed for a Temporary Use Permit for a sales office including model apartments on the 9th floor pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Filed in conjunction...
General construction to renovate apt 524 on the 5th floor. work will include new partitions & finishes, new wood flooring, and new plumbing fixtures. no change in use, egress, or occupancy under this...
Interior alteration within existing tenant space on 1st floor and partial cellar in existing building: new plumbing fixtures and piping routes per new dental office layout. new plumbing fixtures calcu...
Interior alteration within existing tenant space on 1st floor and partial cellar in existing building: new plumbing fixtures and piping routes per new dental office layout. new plumbing fixtures calcu...
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 9th through 14th floors. No change to egress, use or occupancy.
Air conditioning units replacement on the roof. All existing ductwork to remain. No change in use egress and occupancy.
interior renovation on the 4th floor
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 2nd through 8th floor. No change to egress, use or occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 15th through 19th floors. No change to egress, use or occupancy.