Building Permits in ZIP 10038
Manhattan, NY — 425 permits filed recently
425 permits
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Interior renovation to existing retail space to be used as Eating and Drinking Establishment with less than 74 ppl, following the 2022 AC 28-118.3, and therefore the CO is not required to be amended....
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 9th through 14th floors. No change to egress, use or occupancy.
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 2nd through 8th floor. No change to egress, use or occupancy.
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Air conditioning units replacement on the roof. All existing ductwork to remain. No change in use egress and occupancy.
Demolition of non load bearing interior partitions, doors, floors and ceiling finishes on the 15th through 19th floors. No change to egress, use or occupancy.
Existing mechanical ductwork, piping, supports & accessories to be demolished. no change to egress, use or occupancy.
Interior renovation to existing retail space to be used as Eating and Drinking Establishment with less than 74 ppl, following the 2022 AC 28-118.3, and therefore the CO is not required to be amended....
interior renovation on the 4th floor
Install new kitchen exhaust equipment and air conditioner units: install commercial hood, duct and exhaust system, new fresh air, installation of hvac system on 1st floor. no change in use, egress or...
Installation of a temporary construction fence as per plans. no change in use, egress or occupancy. fence to comply with 2022 nyc building code, chapter 33.
All new Mechanical work for new apartments as shown on plans.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of Scaffold
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
All new Mechanical work for new apartments as shown on plans.
Install new kitchen exhaust equipment and air conditioner units: install commercial hood, duct and exhaust system, new fresh air, installation of hvac system on 1st floor. no change in use, egress or...