Building Permits in ZIP 10038
Manhattan, NY — 427 permits filed recently
427 permits
All new Mechanical work for new apartments as shown on plans.
Install new kitchen exhaust equipment and air conditioner units: install commercial hood, duct and exhaust system, new fresh air, installation of hvac system on 1st floor. no change in use, egress or...
Installation of Scaffold
To install new sprinkler heads and branch piping on the 3rd & 4th floors as per plans. no change in use, occupancy or egress.
Installation of temporary construction fence as per plan. no change in use, egress or occupancy.
Sprinkler work alt2 herewith for 18th floor interior alteration. no change is use, occupancy or egress
This Alt MS application is being filed for mechanical duct work in conjunction with the General Construction application. Work to include installation of water source heat pump, new ductwork, air outl...
Installation of temporary working platform as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Modifications to existing sprinkler and standpipe systems and related piping as per plans filed herewith.
Modifications to existing sprinkler and standpipe systems and related piping as per plans filed herewith.
Installation of temporary working platform as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
To install new sprinkler heads and branch piping on the 3rd & 4th floors as per plans. no change in use, occupancy or egress.
Installation of temporary construction fence as per plan. no change in use, egress or occupancy.
Sprinkler work alt2 herewith for 18th floor interior alteration. no change is use, occupancy or egress
This Alt MS application is being filed for mechanical duct work in conjunction with the General Construction application. Work to include installation of water source heat pump, new ductwork, air outl...
Modifications to existing sprinkler and standpipe systems and related piping as per plans filed herewith.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Filing for General Construction demising wall as per plans submitted.
Suspended scaffold installation for Facade repair works