Building Permits in ZIP 11201
Brooklyn, NY — 1,006 permits filed recently
1,006 permits
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Propose to reconfigure existing two-family units building with general construction works. install new stair bulkhead. obtain a new c of o. all related filings are filed subsequently.
Installation of temporary beta hoist per plan. no change in use, egress, or occupancy. the beta hoist will be on 1st floor and roof.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is at north, west and south elevations.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the west neighbor's roofs/shaft to the top of the building.
Renovation to include minor removal and installation of non load bearing interior partitions and finishes. replace plumbing fixtures as per schedule b and plans filed herewith. no change in use, egres...
Renovation to include minor removal and installation of non load bearing interior partitions and finishes. replace plumbing fixtures as per schedule b and plans filed herewith. no change in use, egres...
Plumbing modifications on associated piping, as shown on plans filed herewith
Propose to reconfigure existing two-family units building with general construction works. install new stair bulkhead. obtain a new c of o. all related filings are filed subsequently.
Architectural scope associated with the restaurant renovation on the 002FL (Ground floor), no change of use, egress of egress.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary beta hoist per plan. no change in use, egress, or occupancy. the beta hoist will be on 1st floor and roof.
Modification of existing sprinkler system, including cap/removal of existing sprinkler heads,removal of existing piping, and installation of new piping and sprinkler heads, as shown on plans filed her...
Modification of existing supply ductwork on 4th floor. Equipment to remain. No change to use, egress, occupancy or bulk.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the west neighbor's roofs/shaft to the top of the building.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is at north, west and south elevations.
File mechanical work in conjunction with job #: b01200272-i1.
Hs804-k: removal and replacement of roof drains, flashing for existing pipes and associated connections.
Support of Excavation in conjunction with New Building B00600120-I1
Propose interior renovation of unit #1601. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed und...