Building Permits in ZIP 11201
Brooklyn, NY — 1,006 permits filed recently
1,006 permits
Propose interior renovation of unit #1601. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed und...
Hs 804-k: subsequent filing for foundation.
Proposed 30-story & cellar residential building total of 99 dwelling units
Interior non-structural demolition and general construction as shown on plans filed herewith at unit 6a. scope of work includes interior partition, millwork installation, lighting replacement, and ref...
Minor alteration to existing sprinkle heads only. no change in use egress or occupancy
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Interior renovation: removal of gwb, flr, clg & wall finishes & light fixts. install new gwb, flr, clg & wall finishes. install replacement light fixts. no proposed change to use, egress or occupancy....
Mechanical (hvac) work for renovation of existing multifamily building. hvac contractor shall provide all labor, materials, equipment, hoisting, rigging, scaffolding, and services required to complete...
Mechanical work as shown on plans filed herewith. no change in use, egress or occupancy under this application
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valve...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Interior renovation: removal of gwb, flr, clg & wall finishes & light fixts. install new gwb, flr, clg & wall finishes. install replacement light fixts. no proposed change to use, egress or occupancy....
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Mechanical (hvac) work for renovation of existing multifamily building. hvac contractor shall provide all labor, materials, equipment, hoisting, rigging, scaffolding, and services required to complete...
Minor alteration to existing sprinkle heads only. no change in use egress or occupancy
Disconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate ductwork, piping, valve...
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Office renovation for suite 8def as per plans filed herewith. no change to use, egress nor occupancy.
Illuminated non-advertising accessory wall sign - pura vida miami. no change of use, egress or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.