Building Permits in ZIP 11201
Brooklyn, NY — 1,006 permits filed recently
1,006 permits
Adapt & Re-use of existing parking garage into 5 unit 5 story multifamily
Excavation support for the proposed new Con Edison vaults and new columns and footings.
Temporary construction fence in conjunction with work done under application #b01106030.
adding additional sheets of structural plans in conjunction with alt-co b01241649-i1
Excavation support for the proposed new Con Edison vaults and new columns and footings.
adding additional sheets of structural plans in conjunction with alt-co b01241649-i1
Install a new ss hood with new fire suppression system and ac units for the existing commercial coffee shop. working area first floor and roof. no change in bulk, use, egress, or occupancy.
Temporary construction fence in conjunction with work done under application #b01106030.
Hereby filing minor plumbing work at ground floor residential lobby and garage as per plans. no change in use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Application filed for interior partitions build out for 2nd floor gym space and related 1st floor entrances, use and spaces as approved in nb application, no change in bulk, use, egress, occupancy und...
Sidewalk Shed Installation
Sidewalk Shed Installation
Application filed for interior partitions build out for 2nd floor gym space and related 1st floor entrances, use and spaces as approved in nb application, no change in bulk, use, egress, occupancy und...
Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan.
Hs 804-k: removal and reinstallation of roof top hvac equipment, removal and replacement of 2 exhaust fans, split system and provide temporary ac equipment.
Installation of reinforcing steel to support additional weight of data center racking and equipment.
Restoration facade repairs, partial roof replacement of hexagonal setback roof , parapet repairs, repoint dome TC joints.
Replace existing water cooled ac with air cooled split system in the 24th floor it room. no change in use, egress, or occupancy under this filing.
Construct new thirty-three (33) story mixed-use building as per plans filed.