Building Permits in ZIP 11201
Brooklyn, NY — 1,028 permits filed recently
1,028 permits
Partial Demolition/ Renovation of 8th floor and additional enabling work on Cellar, 1st, 3rd, 4th, 5th, 7th and roof as shown on plans filed herewith. Filed in conjunction with subsequent MS, PL, SP/S...
Partial Demolition/ Renovation of 8th floor and additional enabling work on Cellar, 1st, 3rd, 4th, 5th, 7th and roof as shown on plans filed herewith. Filed in conjunction with subsequent MS, PL, SP/S...
Nyu - ex. fans - mechanical modifications according to plans filed herewith. no change to use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of temporary sprinkler loop on 3rd floor as per plans. no change in use, egress or occupancy.
Installation of temporary shoring as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Mechanical work to renovate apt units #s2 at 3rd fl, #a3at 4th floor & roof. no change to use, egress oroccupancy
Interior Renovation of the 8th Floor for installation of temporary core sprinkler protection with (11) sprinkler heads.
Interior alterations as per plans filed herewith without change to use, egress, occupancy or bulk.
Demolition of interior partitions and removal of plumbing fixtures in existing offices for whitebox. no change in use, egress or occupancy.
Change of 4 dwelling units to 3 dwelling units on existing 4 story building. no change in use,egress, or occupancy. obtain new c of o.
Renovations and combination of apt 3m&l as per tppn #3/97. no change in use, egress or occupancy.
plumbing work filed in conjunction with apartment renovation.
Interior demolition on cellar - 1st fls; new 1st floor slab; facade repair to for duct support connections; roof replacement and replacement of exterior metal stair and catwalk for mechanical equipmen...
Interior Renovation of the 8th Floor for installation of temporary core sprinkler protection with (11) sprinkler heads.
Renovations and combination of apt 3m&l as per tppn #3/97. no change in use, egress or occupancy.
plumbing work filed in conjunction with apartment renovation.
Mechanical work to renovate apt units #s2 at 3rd fl, #a3at 4th floor & roof. no change to use, egress oroccupancy
Interior demolition on cellar - 1st fls; new 1st floor slab; facade repair to for duct support connections; roof replacement and replacement of exterior metal stair and catwalk for mechanical equipmen...
Interior alterations as per plans filed herewith without change to use, egress, occupancy or bulk.