Building Permits in ZIP 11201
Brooklyn, NY — 1,019 permits filed recently
1,019 permits
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior renovation to combine apartment 2g and 2h as per plans filed herewith. related plumbing work filed as subsequent application. no change to use, egress or occupancy.
Application filed to show the replaceiwent of lintel at front doors. no change in use, egress and occupancy.
Install new chimney liner. no change to use, occupancy or egress. no change in use, occupancy, or egress.
Interior non-structural demolition and general construction as shown on plans filed herewith at unit 6a. scope of work includes interior partition, millwork installation, lighting replacement, and ref...
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Installation of pipe scaffold at 210 joralemon street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Interior renovation to combine apartment 2g and 2h as per plans filed herewith. related plumbing work filed as subsequent application. no change to use, egress or occupancy.
Install new chimney liner. no change to use, occupancy or egress. no change in use, occupancy, or egress.
Job filed to show interior renovation to the basemenet and 4th floor and conversion from 10 dwelling units to 7 dwelling units as per plans filed herewith. new certificate of occupancy requested.
Installation of pipe scaffold at 210 joralemon street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Filing for structural modifications for an apartment renovation as per plans filed. No change of use, egress or occupancy.
Renovate Apt 50/5 fl;, Work includes general construction, removal & construction of interior non-load bearing partitions & related finishes; total apt sf is 940, areas of work is 315 sf. Sub Doc file...
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.